Add photo
Description
Technical moves down low lead to jugs up high as is standard for this panel. The last clip before the anchors is a perma-draw.
Location
The third route from the left side of this sector and the right-most route on the overhung panel forming the left side of this sector.
Protection
5 bolts plus one perma-draw. Anchors with fixed lower off biners.